外墙岩棉保温板的施工工艺要注意哪些?

发布时间:2024-01-05 来源:http://www.hmbwcl.cn/

基层墙体应符合相应基层墙体质量验收规范的要求,保温施工前应会同相关部门做好结构验收的确认。如基层墙体偏差过大,则应抹砂浆找平。

The grassroots wall should meet the requirements of the corresponding quality acceptance standards for grassroots walls. Before insulation construction, confirmation of structural acceptance should be carried out in conjunction with relevant departments. If the deviation of the base wall is too large, it should be leveled with mortar.

房屋各大角的控制钢垂线安装完毕。高层建筑及超高层建筑时,钢垂线应用经纬仪检验合格。

The installation of control steel verticals at each corner of the house has been completed. For high-rise and super high-rise buildings, the steel vertical line should be inspected and qualified using a theodolite.

外墙面的阳台栏杆雨漏管托架外挂消防梯等安装完毕,并应考虑到保温系统厚度的影响。

The installation of balcony railings, rain pipes, brackets, fire ladders, etc. on the outer wall has been completed, and the influence of insulation system thickness should be considered.

外窗的辅框安装完毕。

The auxiliary frame of the outer window has been installed.

墙面脚手架孔,穿墙孔及墙面缺损处用相应材料修整好。

20220611115338460.jpg

Wall scaffold holes, through wall holes, and wall defects shall be repaired with corresponding materials.

混凝土梁或墙面的钢筋头和凸起物完毕。

The steel reinforcement heads and protrusions on concrete beams or walls have been removed.

主体结构的变形缝应提前做好处理。

The deformation joints of the main structure should be treated in advance.

根据工程量施工部位和工期要求制定施工方案,要样板先行,通过样板确定定额消耗,由甲方乙方和材料供应商协商确定材料消耗量,保温施工前施工负责人应熟悉图纸。

According to the requirements of the construction site and schedule, a construction plan should be formulated. The sample should be used first, and the quota consumption should be determined through the sample. The material consumption should be determined through negotiation between Party A and Party B and the material supplier. Before insulation construction, the construction manager should be familiar with the drawings.

组织施工队进行技术培训和交底,进行好教育。

Organize construction teams to receive technical training and briefing, and provide safety education.

材料配制应指定专人负责,配合比搅拌机具与操作应符合要求,严格按厂家说明书配制,严禁使用过时浆料和砂浆。

The material preparation should be assigned a dedicated person, and the mixing equipment and operation should meet the requirements. The preparation should strictly follow the manufacturer's instructions, and the use of outdated slurry and mortar is strictly prohibited.

根据需要准备一间搅拌站及一间堆放材料的库房,搅拌站的搭建需要选择背风方向,靠近垂直运输机械,搅拌棚需要三侧封闭,一侧作为进出料通道。有条件的地方可使用散装罐。库房的搭建要求:防水防潮防阳光直晒。材料采取离地架空堆放。

Prepare a mixing plant and a warehouse for stacking materials as needed. The construction of the mixing plant needs to be in a leeward direction, close to vertical transportation machinery. The mixing shed needs to be closed on three sides, with one side serving as the inlet and outlet channel. Loose cans can be used where conditions permit. Construction requirements for the warehouse: waterproof, moisture-proof, and sun resistant. The materials are stacked overhead from the ground.

施工时气温应大于5℃,风力不大于4级。雨天不得施工,应采取防护措施。

During construction, the air temperature should be greater than 5 ℃ and the wind force should not exceed level 4. Construction is not allowed on rainy days and protective measures should be taken.

感谢您的阅读,此文的文章来源:华美橡塑保温山东总代理更多的内容和问题请点击:http://www.hmbwcl.cn我们会继续努力的为您提供服务,感谢您的支持

Thank you for reading. The source of this article is Huamei Rubber Insulation Shandong General Agent. For more content and questions, please click: http://www.hmbwcl.cn We will continue to work hard to provide you with services. Thank you for your support



上一篇:橡塑保温管施工胶水的正确使用
下一篇:隔音隔热玻璃棉的使用特点介绍